PROJECTS OF SIGNIFICANCE
INDIA
For Reliance Industries Limited
350 beds- Multi Specialty Acute Care Hospital Campus for Sir H. N. Hospital & Research Centre, Mumbai, India with MOB, Acute Care Beds, Surgeries, ICU’s, full-fleged Rehabiltation Unit, Complete Diagnostics, Clinics, Medical Mall, Nursing School etc.
Project Responsibilities: Established the Strategy, Medical Program, Programming, Medical Design Basis, Medical Planning from Concept thru’ Design Development, Medical Equipment Planning [generic listing], Selection of Design Engineering Consultants, etc.
Project Size: 632,360 sft
Project Cost: USD 100 MM (at Indian Costs)
For Bajaj
135 Beds-Multi Specialty Acute Care, Kamalnayan Bajaj Hospital, in Aurangabad.
Project Responsibilities: Established the Strategy, Medical Program, Programming, Medical Design Basis, Medical Planning up to Schematics
Project Size: 140,734 sft
Project Cost: USD 25.6 MM (at Indian Costs)
For Government of India, Parliamentary Committee for Health
“A National Healthcare Strategy for India” for the Parliamentary Committee on Health, to Prime Minister of India, Mr. Atal Behari Vajpayee, sponsored by Reliance Industries. The study was submitted in April 2000.
Project Responsibilities: Established Project Scope, Defined parameters of the study, selected specialists for the study from shortlist by Anderson Consulting. Chaired the entire Co-ordination and Review Process.
For Haji Abdul Majid Ajmal Foundation
350 Beds- Haji Abdul Majid Memorial Hospital and Research Centre, Hojai, India
The first phase, of 100- Beds, was inaugurated by Late Mother Teresa.
Project Responsibilities: Established the Strategy, Medical Program, Programming, Medical Design Basis, Medical Planning up to Design Development, Equipment Planning.
Project Size: 140,734 sft
For Late Mr. Shantibhai K. Somaiya
K.J. Somaiya Medical College, Mumbai, India
Established Strategic Plan, Medical Plan & Master-plan for the entire Campus along with HMC International, CA, USA.
KENYA
For Aga Khan Foundation Development Network
Aga Khan Hospital, Nairobi , Kenya; Phase 2 that includes new construction for a very high-tech Imaging with Nuclear Medicine, Surgery, Ambulatory Surgery, Cardiology Center, CTSICU, ICU, Renal Dialysis, CSSD, Pharmacy, Radiotherapy and Chemotherapy Units, Cancer Clinic & Support Services.
Project Responsibilities: Medical Programming, Medical Design Basis, Medical Planning, from Concept thru’ Design Development, Medical Equipment Planning [generic listing]
Project Size: 146,960 sft
Project Cost: USD 49 MM (at Kenyan Costs)
TANZANIA
For Aga Khan Foundation Development Network
Aga Khan Hospital, Dar-es-Salaam, Tanzania; Phase 2 that includes new construction for a very high-tech Imaging, Surgery with Ambulatory Surgery, Full Rehab Unit, ICU, Clinics, CSSD, and retrofitting for Emergency, Pharmacy & Support Services.
Project Responsibilities: Medical Programming, Medical Planning, Medical Design Basis from Concept thru’ Design Development
Project Size: 109,640 sft
Project Cost: USD 40 MM (at Kenyan Costs)
WORLD BANK & UNITED NATIONS ORGANIZATIONS
For Government of Benin (Funded by IBRD (World Bank) thru’ ECOWAS)
600 beds- Multi-Specialty Acute Care Hospital Project, Cotonou, Benin, West Africa:
Project Responsibilities: Design Build on turn-key basis, thru’ our JV company, Hospital Planning Corporation West Africa
Project Cost: USD 300MM
Project Status: Contract Mobilization
For UNITAR & WDAF
50 Beds- Rural Hospital (a joint effort between World Direct Assist Foundation [WDAF], United Nations Institute of Training and Research [UNITAR] and Office of the Consul General of Indonesia, Vancouver, Canada.)
Project Responsibilities: Strategic Planning Programming & Medical Design Basis, Medical Planning from Concept thru’ Design Development, Medical Equipment Planning.
Project Size: 50,000 sft
Project Cost: USD 3.7MM.
ARGENTINA & BRAZIL
For Allied Medical Holdings
300 Beds - Multi Level Care Facility, Allied Medical Holdings, Argentina
Project Responsibilities: Established the Strategy, Medical Program, Functional Space Programming, Medical Design Basis
Project Size: 458,380 sft
Project Cost: USD 210 MM (at Argentinean Costs)
100 Beds- Rehabiltation and Continuing Care Facility, Allied Medical Holdings, Rio de Janeiro, Brazil
Project Responsibilities: Completed Medical Planning & Programming
Project Size: 73,264 sft
Project Cost: USD 37 MM (at Brazilian Costs)
CHINA
For Shanghai International Medical Group Co.
Kidney Dialysis Unit, Shanghai International Medical Group Co. Ltd, Shanghai, China
Project Responsibilities: Completed Medical Planning & Programming
Project Size: 11,350 sft
Project Cost: USD 10 MM (at China Costs)
UNITED ARAB EMIRATES
For Al Ghurair Group
500 beds Hospital and Medical School Campus, Dubai; (ETA-ASCON Group, Dubai JV with MAHE, Manipal)
Project Responsibilities: Established the Strategy Medical Program, Programming, Medical Design Basis, Business Plan
Project Size: 547,560 sft
Project Cost: USD 110 MM (at UAE Costs)
200 beds- Multi-Specialty Acute Care Hospital with MOB and Medical Mall, Al Ghurair Group, in Dubai.
Project Responsibilities: Market Analysis, Strategy, Medical Program, Programming, Medical Design Basis, Business Pan
Project Size: 274,000 sft
Project Cost: USD 54.8 MM (at UAE Costs)
Arabian Health Services (Al Ghurair Group JV with Munich Re) Dubai, U.A.E
Project Responsibilities: Establishing a TPA / PPO business, Strategic Alliance/Partnership & Planning, Business Planning, Health Plans Development. It was the first such business established in that country and Dr. Khalil was commended and felicitated by Dubai Chamber of Commerce for introducing new business in the Dubai economic and Healthcare Sector.
IRAQ
For Iraqi Ministry of Health
10 Teaching Hospitals of 400 Beds each. Ministry of Health Hospital Projects, Iraq
RFP & Contract-Bid, as Medical Planner, along-with FNDA Architecture Inc. and Najam Associates (Contractors)
Bidding from 42 pre-qualified International Design-Build Contractors completed.
Final 2 contractors short-listed to decide award of Contract.
Our Team is short-listed as # 1 in Technical Bid & #2 in Financial Bid
Project Size: | Package 1 | LOCATION | AREA SQ. FT. |
| Naynawa-Musil | 1,748,500 |
| Diwanya | 1,042,752 |
| Theyqar-Al Nasriya | 67,500 |
| Missan | 1,345,000 |
| Babil-Hilla | 1,148,092 |
| Package 2 | | |
| Diyala-Bakooba | 672,500 |
| Baghdad-AlSadr City | 1,076,000 |
| Najaf | 977,546 |
| Karbalaa | 1,506,400 |
| Wasit-Koot | 1,210,500 |
Project Costs: USD 1 Billion approx. for each Package (Total USD 2Billions) Project Status: Final Results awaited